I-83 Exit 10 (LOGANVILLE, PA)

This $11.4 million PennDOT project was awarded to Kinsley via the traditional design, bid, build method. This project involves improvements to the I-83 Exit 10 interchange, with construction items including replacement of the existing SR 3100 over I-83 with a 2-span continuous composite pre-stressed concrete bulb-tee beam structure, approach roadwork including the realignment of SR 3100, widening of SR 3100, upgrading and widening the interchange ramps to provide enhanced acceleration and deceleration lanes, re-alignment of the interchange ramps, concrete pavement, guiderail, fencing, milling, paving, pavement markers and other miscellaneous operations. Also included is the removal of the existing SR 3100 over I-83 bridge structure after the new bridge is completed and traffic is utilizing the new structure over I-83. This project is scheduled to be completed in the summer of 2014.